The Work under this project consists of the replacement of the Heating, Ventilating and Air Conditioning (HVAC) system at Matthew Whaley Elementary School, located in the City of Williamsburg, Virginia. Matthew Whaley is a three-story, 67,750 square-foot brick building built in 1931. The current HVAC system at Matthew Whaley Elementary School was installed in 1998 and has reached the end of its useful life. One air-cooled chiller (out of two) was replaced in 2019, and its replacement is included in this project as Additive Bid Item #1. All hydronic pumps were replaced in 2019 and are excluded from the scope of this project. The hot water boilers were replaced in 2022 and are excluded from the scope of this project.