The WORK includes but is not limited to the following description. The City of Bremerton will replace a damaged section of the Central Bremerton Force Main along Gregory Way, Naval Avenue, and 1st Street with 18-inch AWWA C905 PVC. The existing pipe is 14-inch ductile iron. The replacement area begins approximately 150 ft east of Gregory Way & High Avenue and extends to 1st Street & Montgomery Avenue, for a total pipe length of approximately 3,100 feet. Key locations include: the high point of the force main near High Avenue and Gregory Way, where an surge chamber will be installed; the intersection of Burwell Street and Warren Avenue, where a bypass pipe and isolation valves will be installed to allow the pipe to be drained; the reach of pipeline in Naval Avenue directly adjacent to the Naval Base Kitsap (NBK) access gate.