Construction and installation of four new microwave towers, and up to 16 wireless sites located on existing dedicated utility pole. All towers and sites will be connected to fiber optic backhaul or microwave backhaul around the Colville Confederated Tribal Reservation in order to extend the coverage of the Fixed Wireless Access (FWA) network providing Internet service to customers located beyond the reach of the fiber network. The fiber optic network will be constructed concurrently with the wireless network. The contractor will be responsible for completing the wireless sites by placing structures, cabinets, placing & connecting fiber, activating electric power, and installing equipment at the site to a point where the site can be commissioned and operated. The main areas of work will take place the following locations: Disautel Mountain (48o 22’ 39.266” N, 119o 16’ 52.025” W) Highway 21 (48o 01’ 2.105” N, 118 o 40’ 45.542” W) Kewa (48o 11’ 7.813” N, 118 o 17’ 10.782” W) Inchelium Hill (48o 18’ 2.429” N, 118 o 13’ 2.205” W)