1. Downspouts: state the lump sum cost to install new downspouts where missing. Terminate the downspouts as follows; Test the existing open storm inlets for internal leaks or blockages. Where functional, connect downspouts to existing storm inlets where present with sealed boots. For other downspouts, install downspout bends and extensions 5' into the yard. Where discharging to grade, add heavy soil at these areas along the foundation, to slope drainage away. $_____________________________________________________ 2. Northwest Basement Stair: state the lump sum cost to remove the existing stair, to allow access for the foundation repairs. Build a new code-compliant stair at this location after all foundations repairs are completed. Where new wood construction contacts masonry or cement, use pressure treated. Install a code compliant handrail. $_____________________________________________________ 3. Northeast Foundation Wall Replacement: state the lump sum cost to remove the existing brick foundation and install a new CMU masonry foundation wall and footing at the Northwest corner of the basement. (VM Engineering Report, 10/10/2024, Recommendation #1) $_____________________________________________________ 4. West Foundation Wall Replacement: State the lump sum cost to remove the existing brick foundation and install a new CMU masonry foundation wall and footing along the entire remaining West (alley) wall. (VM Engineering Report, Revision Note 10/10/2024). Note: If this work requires the removal of any alleyway paving in order to affect this repair, then Department of Public Works permits shall be required; 1.) Approach Permit, and 2.) Right of Way Permit. The contractor shall include the costs for paving removal, replacement, permits, and all other necessary work. Any DPW bonding, if required, shall be obtained by the contractor. $_____________________________________________________ 5. Partial Drain Tile System: State the lump sum cost to install a drain tile system at the new foundation walls and the walls being braced as part of this work. Install a sumpcrock and code-compliant discharge to the exterior rear yard. Tie all sections of drain tile to the sump crock. Replace all concrete flooring disturbed as part of this work. Do not discharge across walk-ways or porches. (VM Engineering Report, 10/10/2024, Recommendation #3). Plumbing permit required. $____________________________