2. Asphalt Repair a. Provide all labor equipment and materials for the following areas: i. Grant Elementary School 1. Patch/replace asphalt in poor condition around Grant Elementary School. Approximately 4731 SF of asphalt will need to be removed and replaced. ii. Glenrock High School: 1. Patch/replace asphalt in poor condition around the drain near the Glenrock Jr/Sr High School Stadium. Approximately 369 SF of asphalt will need to be removed and replaced. 2. Remove and replace asphalt in poor condition West of the vocational shops. Approximately 4541 SF of asphalt will need to be removed and replaced 3. Crack Sealing, Mastic Repairs, and Striping a. Provide all labor equipment and materials for the following area: i. Grant Elementary School 1. All cracks around Grant Elementary School will be sealed and repaired. 2. Striping will be completed on all areas after cracks have been sealed/repaired.