Specifications include, but are not limited to: The Project is located at the Northeast Corner of East 12th Street and South Conwell Street in Casper, Wyoming. The Project Owner is Natrona County. The Project Architect is MOA Architecture. The Project will consist of a new, approximately 35,000 square foot, single story, Casper – Natrona County Health Building located on approximately 8.5 acres. The new Health Department building will be home to administrative, counseling, education services, a disease prevention clinic, environmental health, adult health, community prevention, maternal and child health services, emergency preparedness, and communicable disease services. New construction will consist of excavation and backfill, drilled piers, concrete foundations, structural floor with concrete fill on composite metal deck over an accessible crawl space, structural steel framing, elastomeric roofing, brick masonry and stone veneer, aluminum framed curtain wall and storefront. Interior finishes include but not limited to metal stud and gypsum board partitions, steel doors and frames, wood doors, ceramic tile, porcelain tile, carpet, resilient flooring, gypsum board and acoustical tile ceilings, finish carpentry and casework, and specialties. Security, audio/visual, HVAC, plumbing, fire protection, and electrical systems will also be part of this construction. The site improvements include site preparation, grading, site utilities, storm drainage, site concrete, bituminous paving, irrigation systems, landscaping, site power and lighting. It is anticipated that the total estimated construction cost of the entire Project will be approximately $25,000,000.00. Sources are Natrona County General Funds, CNCHD Board of Health, Federal ARPA funds, and Health Resources and Services Administration (HRSA) funds with additional funding to come.