Specifications include, but are not limited to: Project includes 21-inch PVC gravity sewer installation, concrete vaults with inline macerating grinders, wet well construction with interior epoxy coating, excavation and dewatering, structural concrete installation, installation of prefabricated turnkey lift station capsule, force main installation with a horizontal directional bore under the North Platte River, water service installation, manhole installation and gravity sewer repair at the Wastewater Treatment Plant, electrical installation and backup generator, SCADA controls and programming and finally security fencing. During post construction of the new lift station, the existing lift station will be demolished and removed from site.