Specifications include, but are not limited to: The Project generally consists of replacing the aging sewer mains in the 2.5, and 3.5 Alleys between Center Street and Elm Street. In total the project includes approximately 1690 L.F of 8-inch SDR35 PVC sewer pipe, 320 L.F of DR25 water class sewer pipe, and approximately 315 L.F. of SDR26 fusible PVC installed via pipe bursting, new manholes, and sewer services. This project also includes the replacement of approximately 215 L.F. 6-inch C900 PVC water main with water services and fire line connections. Finally, this project includes the full depth reconstruction of both alleys with asphalt pavement and the installation of a concrete valley gutter at the center of each alley.