The City requires all parties interested in this bid opportunity to email the City and request to be added to the plan holder list. See Notice to Bidders for more information.
The City of Pleasanton proposes to construct a southbound right-turn lane along Hopyard Road at the Owens Drive intersection. On the south side of the Hopyard Road/Owens Drive intersection, modifications include adding a second northbound left-turn lane and eliminating the northbound free right-turn lane. This project also includes adding a southbound bike lane to close the existing bike lane gap from the I-580 eastbound off-ramp intersection to 180 feet south of Owens Drive. The proposed improvements within State right of way require an encroachment permit from Caltrans.
This work will consist of, but is not limited to, traffic control, temporary striping, excavation of existing roadway and concrete sidewalks, driveways, and medians, landscaping and irrigation modification, tree removal, drainage systems, installation of concrete sidewalks, curbs, driveways and sound wall, cold planning, HMA overlay, slurry seal, sealcoat, pavement delineation, modifying lighting system and installation of traffic signal system.
The Engineer’s cost estimate for the project is $3.5 million.
There will be no pre-bid meeting for this project.