Summary of Specifications:
These qualification statements will be used to prepare a shortlist of consultants deemed “best qualified” for the listed divisions. This shortlist will also be used by and for City of Centennial projects. Firms may propose on any of the divisions of projects listed: DIVISION I MAJOR ROADWAY PROJECTS DIVISION II MINOR ROADWAY PROJECTS DIVISION III BRIDGES DIVISION IV GEOTECHNICAL SERVICES DIVISION V TRAFFIC AND TRANSPORTATION ENGINEERING SERVICES DIVISION VI SURVEYING AND AERIAL MAPPING DIVISION VII CAPITAL DRAINAGE DIVISION VIII REMEDIAL DRAINAGE DIVISION IX STORMWATER MANAGEMENT SERVICES DIVISION X RIGHT-OF-WAY NEGOTIATION SERVICES DIVISION XI FLOODPLAIN ANALYSIS DIVISION XII TRAIL, NATURAL AREA AND OPEN SPACE DESIGN SVCS
A pre-proposal conference will be held in the (Arapahoe Conference Room in the DSIM offices, 10730 East Briarwood Ave., Centennial, CO 80112 at 11:00 A.M., local time, on the 18th day of November, 2003. The pre-proposal conference will be the last time before consultant Statement of Qualification submittal in which the County will answer questions or provide clarification/ interpretation of the Request for Qualification documents.