Summary of Specifications:
Boulder County Parks & Open Space (BCPOS) is accepting proposals from qualified and experienced firms to secure engineering services for the rehabilitation of the Western Mobile Lake 4 Dam and Reservoir (Lake 4) Rehabilitation (Project). The Project is a joint undertaking of BCPOS and the St. Vrain and Left Hand Water Conservancy District (District), the joint and equal owners of the dam and reservoir. These services are needed to repair damage that occurred to the dam and to remove sediments deposited in the reservoir caused by the flood of September, 2013. This repair shall be in compliance with the State of Colorado, Department of Natural Resources, Division of Water Resources, Office of the State Engineer, Dam Safety Branch (SEO) “Rules and Regulations for Dam Safety and Dam Construction.” Funding for the Project is expected to occur from a combination of FEMA Public Assistance (PA) and related public funds, and funds from the project owners. The selected engineering firm (contractor) will have 90 calendar days to complete an evaluation and preliminary design of the rehabilitation from the date of execution of the contract. A second and immediately following phase of the project will be to prepare a final design, and construction documents. A third phase will be to provide engineering services during the construction.