The primary work to be performed under this contract includes construction of improvements to Cherry Creek to stabilize and restore function to Cherry Creek. Construction includes, but is not limited to: mobilization, clearing and grubbing, surveying, traffic control, water control, erosion and sediment control items, removing and replacing existing fence and boulder edging, earthwork and haul off-site, topsoil excavation and replacement, soil riprap and riprap placement, repair of the crusher fines trail as needed, installation of steel sheet pile and steel sheet pile cap, and site stabilization including seeding, erosion control blanket, mulch, and willow stakes.
The primary work to be performed under this contract includes construction of improvements to Cherry Creek to stabilize and restore function to Cherry Creek. Construction includes, but is not limited to: mobilization, clearing and grubbing, surveying, traffic control, water control, erosion and sediment control items, removing and replacing existing fence and boulder edging, earthwork and haul off-site, topsoil excavation and replacement, soil riprap and riprap placement, repair of the crusher fines trail as needed, installation of steel sheet pile and steel sheet pile cap, and site stabilization including seeding, erosion control blanket, mulch, and willow stakes.