The bleachers on the pool side of the locker rooms need to be re-configured to make room for the new doors from the locker rooms into the pool area. It is important that the contractor use temporary walls to keep the public from entering the construction zone and dust protection to alleviate as much dust from the build getting into other areas of the building. The drains are accessible from the weight room in the lower level. The weight room equipment will have to be re-located prior to the work starting, once the work is completed the equipment will have to be moved back. This will be done by others. The current locker rooms must remain open, on a limited basis, until the family changing rooms are complete. Once the family changing rooms are completed, they will be used so the locker rooms can be closed for construction. As stated above in the “Goals” section, the current locker rooms will be demolished and rebuilt. Both men and women will have individual showers with benches and doors for more privacy. The shower area will have a hard ceiling and updated lighting. A drop ceiling will be installed in the general locker room. The new locker room walls will be tiled and epoxy grouted, The floor will be epoxy coated, with updated lighting throughout. New vanity solid surface counter tops and under mounted sinks and ADA compliant faucets, hose bibs will be installed under the vanities, these will be used to aid in cleaning. Lockers will be installed at the opposite ends of the room on a concrete type of bench. The architectural firm has been retained to answer RFI’s.