Summary of Specifications:
SCOPE: The work to be performed under this contract includes the replacement of the north playground at Kensington Park and adjacent site improvements. Work includes removal and demolition of existing concrete playground curbing and adjacent sidewalk, installation of new playground curbing, sidewalk and concrete flatwork, installation of specified playground equipment, drainage, poured-in-place (PIP) playground surfacing, and minor turf and irrigation repairs adjacent to the work zone. The Contractor shall supply all labor, materials and equipment necessary to complete the work in accordance with the contract plans and specifications. BID CONDITIONS: The primary contractor shall have minimum of (3) park projects of similar scope completed within the last 5 years. Include this information and referrals as part of the Bidders Qualification Data (pages 4 and 5) of the Bid Submittal Document. The apparent low bidder will also be required to demonstrate that playground equipment and surfacing installers have a minimum of 5 years of experience installing their respective product and shall have a Certified Playground Safety Inspector (CPSI) from the National Playground Safety Institute (NPSI) on staff with the ability to certify safety and ADA compliance regulations. Documentation and references to demonstrate these qualifications will be required prior to award of contract.