Summary of Specifications:
3rd Avenue to 6th Avenue . SCOPE: The work to be performed under this contract includes, but is not limited to: the demolition and reconstruction of alleys, breezeways and parking lots with coordination between the selected contractor and utility service companies to install underground (dry/shallow) utilities in conjunction with demolition and excavation activities. Close coordination will also be required between the Contractor and the adjacent property owners. Work involves placement of asphalt, concrete, permeable and non-permeable concrete unit pavers, stormwater infrastructure, lighting, landscape and irrigation improvements. The selected contractor shall supply all superintendence, labor, materials and equipment necessary to complete the work in accordance with the Contract Documents. . BID CONDITIONS: 1. The Contractor will be permitted to sublet a portion of the Contract, however, the Contractor’s organization shall perform work amounting to at least thirty (30) percent or more of the total original contract amount. Refer to the Project Special Provisions, Revision of Section 108 – Subletting of Contract.
2. The City of Longmont is seeking qualified Contractors with applicable experience comparable to the Scope of Work described above. The Contractor’s representative who is directly responsible for managing the project and the Contractor’s on-site representative who has immediate charge on a daily basis shall each have satisfactorily completed the same responsibilities on at least one project of similar scope in the last 5 years. Project(s) shall be listed as one of the three projects of similar nature when completing the Bidder’s Qualification Data form, included with the Bid Submittal Documents. Any Contractor that fails to comply with this requirement could be considered non-responsive.