This project consists of utility, pedestrian and roadway improvements on 19 Rd. between Highway 6 & 50 and J.2 Rd. in the City of Fruita. Work includes, but is not limited to, traffic control, the modification of existing and installation of ±1,250’ of new domestic water line and fittings, ±4,200’ of sanitary sewer line, ±5,000’ of storm drain line, ±2,500’ of irrigation line, inlets, manholes and diversion boxes, removal of an existing canal box culvert, installation of ±150’ of new cast-in-place canal box culvert, stormwater BMP installation & maintenance, earthwork, grading, road reconstruction and widening, removal and replacement/resetting of fences, driveways, culverts, mailboxes, etc., installation of concrete curb ramps, traffic islands and sidewalks, and surface restoration/reseeding once underground and paving improvements are completed. A portion of the work will take place in the CDOT right-of-way at the intersection of 19 Rd. and Highway 6 & 50.
The project is anticipated to have a delayed construction start of mid-November 2024 in order to avoid impact to irrigation water delivery; however, if the contractor feels that some work can take place without disruption to irrigation delivery and with a minimal amount of impact to traffic on affected roads, the City will consider allowing construction activities to commence early.
You can learn more about the project here.
Bidders are requested to provide contact information to Fruita Public Works Department for addendums or bid information by emailing Steve Martinez smartinez@fruita.org.