Summary of Specifications:
SCOPE OF WORK
Welby Community- Playground Surfacing / Site Preparation
Furnish all labor, equipment, materials, supplies, tools, rentals, and transportation to perform all operations in connection with project to complete removal of identified equipment and site prep for new installation of new playground equipment.
All Work completed on the project will be performed in compliance with the Davis-Bacon Act and Federal Labor Standards Provisions (See Attachment 1, Davis-Bacon Prevailing Wages; and Attachment 2, HUD-4010 Form; and Attachment 3, Davis-Bacon Bid Language). All workers employed on this project shall receive the minimum prevailing Davis-Bacon wage requirements or latest version. Wage requirements may change prior to start of work; current wage rates are in effect at the time of the bid opening. Wages will be effective 90 days after bid opening. If construction contract is not signed within the 90 day period, the most current wage rates will be in effect at that time.
On all federally funded projects the apparent awarded vendor must be verified that they are no listed as debarred on the SAMS debarment list. Mapleton Public Schools will verify debarment prior to award.
• Saw cut and remove approximately 4,000 sf of asphalt (in purple on diagram 1) • Prepare surface to minimum 12” fall depth, install concrete curb around the perimeter as a containment boarder for the wood fiber chips, as necessary, due to slight slope of site. • Install ramp if needed by main entrance gate. • Prepare surface for felt and drain tiles install (felt, drain tiles and fiber chips will be installed by playground installer) • Install 4’ fence with gate to new perimeter (marked in orange on diagram). Maintain fire lane gate opening as well. • Install 50’ of 8’ fence behind current basketball goals • Mask and repaint tetherball and basketball lines • Mask and repaint parking space lines as indicated in Diagram 2
*bidder to verify actual square footage needed for all line items. Reference- Diagram 1 and 2