The project consists of but is not limited to the construction of a new six-inch and eight-inch C900 PVC potable waterline between Loma Dr. and the Assumed District Northern Boundary on Cashmere Ave. The project also consists of but is not limited to the demolition/abandonment of existing 6- inch AC waterline, service meters, and fire hydrants, salvage of appurtenances, construction of a new six- inch and eight-inch C900 PVC potable waterline on Sapinero Drive, and installation of four (4) 45° bends. Both projects will consist of placing new waterline via open trench methods including hydrants, valves, tie- ins, and appurtenances, erosion control, earthwork, cutting and patching and repaving of roads, and all appurtenances as specified and required for a complete and functional system. The project will install approximately 285 linear feet of new 6-inch C900 PVC waterline on Sapinero Drive and approximately 815 linear feet of new 6-inch C900 PVC waterline on Cashmere Ave north of East Loma Drive. All materials as indicated on the drawings will be provided by the contractor and must be installed, along with the completion of all associated site work relating to the new potable waterline.