The Smoky Hill Metropolitan District located at 5405 S. Telluride Street in Centennial, CO is seeking bids for the following:
Smoky Hill Metropolitan District is seeking bids for refreshing our playground mulch
including installing new rubber mats under the mulch in our 6 parks with playgrounds.
The playground mulch refresh must be with Engineered Wood Fiber (EWF), which is
blown in, and not manually installed. Also included must in this bid submission must be
new rubber swing mats under the new EWF.
Smoky Hill Metropolitan District has 6 parks (please see attached map with addresses).
Goldrush Park: Located at 5204 S. Pitkin Court needs approx. 58 cubic yards,
Big Rock Park: Located at 17496 E. Belleview Place needs approx. 68 cubic yards,
Big Sandy Park: Located at 17903 E. Progress Place needs approx. 32 cubic yards,
Arrowhead Park: Located at 18249 E. Crestline Cir. Needs approx. 64 cubic yards
Smoky Hill Park: Located at 5405 S. Telluride Street (behind the clubhouse and pool)
needs approx. 146 cubic yards, and
Crestline Park: Located at 17071 E. Crestline Ave. needs approx. 24 cubic yards.
We require that the Engineered Wood Fiber is to be blown in instead of manually installed.
If you have any questions, please contact.
Jerry Dionisio
Smoky Hill Metro District
Secretary / Treasurer
303-910-7287