General Description - The work to be performed under this contract includes removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, asphalt patching, various depths and types of milling of existing asphalt pavement, and various thicknesses of asphalt paving within the streets which will be marked in the field or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received and the contract documents. Night work shall be required and entail asphalt patching, asphalt milling, and asphalt overlay on Factory Shops Blvd., between Meadows Parkway and Outlet Access, and Park Street, from Wolfensberger Rd to 5th Street Bridge. Both locations shall be completed before June 26, 2020. Contractor will be required to coordinate construction activities with adjacent businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable. The contractor shall commence work no later than three (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within seventy (70) working days from the date on the Notice to Proceed. If “Construction Completion” is not issued within the allotted contract time for the original scope of work, “Liquidated Damages” shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 13, 2020 and July 31, 2020. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of Notice to Proceed.