SCOPE OF WORK
BAYOU TEXAR BOAT RAMP
2700 Cervantes Street
Pensacola, Florida
Remove and dispose of existing walkways, benches, decking, stringers, and crossmembers. Retrieve used sheet pile from the water and re-use.
Re-use existing pilings sheet pile wall. Any new sheet piling required is considered part of the scope.
Install new white cone piling caps and white rub strips or rubber boat bumpers.
Replace inside stringers and blocking with 2”x 8” pressure-treated lumber 12” on center.
Install Stainless Steel hurricane clips. 304 stainless.
Install 5/4” x 6” (MoistureShield, Timer Tech or equivalent) composite decking with 2.5” stainless-steel deck screws.
Replace outer stringers with 2”x10” pressure treated lumber. Installed with (2) ¾” Stainless Steel bolts and washers per piling.
Walkways will start at the top of the concrete ramp. New pilings will be installed every 6’ down the ramp edge to prevent vehicle damage to the walkways.
Replace handrails in kind with 4”x4” posts and composite rail (MoistureShield, Timer Tech or equivalent) secured with Stainless steel fasteners.
Contractor to furnish all labor, materials, and equipment to complete work
Contractor is to provide a one-year warranty on all workmanship.
Obtain a certificate of proof of liability insurance ($1,000,000) and workers’ compensation with the City of Pensacola named additional insured as a certificate holder. (See detailed requirements.)
Contractor is responsible for all necessary permits as required by City, State, and Federal mandates.
Work must be completed by May 1st, 2023.