Santa Rosa County Schoool District is looking to purchase one boiler for Milton High School. This request for quotation is ONLY for the boiler unit itself. No labor estimate is required. The quote must include the minimum specifications below.
Minimum Specifications for boiler unit:
Fulton Heating Solutions model EDR-2000 "Endura" natural gas fired condensing hot water boiler, with an input of 2,000 MBH, with features as indicated below:
High mass heat exchanger, designed for 160 psi maximum working pressure, ASME stamped, with Duplex stainless steel tubes.
.
15:1 turndown stainless steel mesh burner, with variable speed combustion blower and direct spark ignition with UV flame sensing. Unit is equipped with "Pure" control system, with independent servo control of air and gas for optimum combustion and efficiency.
UL/CSD-1 gas train suitable for incoming gas pressures between 4" - 28". High and low gas pressure switches.
7" touchscreen boiler control with BacNet gateway.
Single boiler condensate trap with pH neutralization basin.
4" motorized isolation valve