The City of Milton is requesting proposals from qualified consultants to provide engineering services on Former Milton Country Club including Hydrology and Hydraulic Services and possible further design services. All Consultants must comply with all general and special requirements of the RFP information and instructions enclosed herein.
This project includes a hydrology study and stormwater management concept plans with the option to advance to stormwater construction design of stormwater drainage improvements at the Former Milton Country Club in the City of Milton. It shall be the Consultant’s responsibility to design, prepare, assemble and coordinate the necessary documents to complete studies, reports, recommended stormwater management concept infrastructure layout, and if determined, provide plans with infrastructure specifications for a final set of construction plans. The completed documents must comply with all applicable local, state, and federal environmental laws and regulations.
The City of Milton reserves the right to reject any or all bid/proposals and to waive technicalities and informalities, and to make award in the best interest of the City of Milton.
See attached document(s):