The City of Milton is accepting sealed bids from qualified firms for the FY19 NE Crabapple Connector Project for the Public Works Department in conformance with Title 32, Chapter 4, Article 4, Part 2 of the Official Code of Georgia Annotated. All work will be done in accordance with Georgia Department of Transportation’s (GDOT) Standard Drawings, Standard Specifications, and Pay Items Index as standards and specifications for the construction and completion of the work required. All bidders must comply with all general and special requirements of the bid information and instructions enclosed herein.
The Contractor shall comply with the plans and specifications for the “NE Crabapple Connector” as prepared by Pond & Company (Design Engineer), dated 10/11/2018 .The plans may be downloaded at:Final Construction Plans NE Crabapple Connector
(https://files.secureserver.net/0sKachBVwD1u5h)
The City of Milton reserves the right to reject any or all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Milton.
See Document(s) below: