The Village of Orland Park is in the process of redesigning two of its parks: Schussler Park and Centennial Park West. The design and permits are expected to be completed in the next three to nine months. The Village of Orland Park is requesting proposals from interested engineering firms for both parks to provide Resident/Construction Engineering (RE/CE) Services. The RE/CE services shall include leading and assisting the Village with the following services during construction of the following two projects: Schussler Park • Convert an existing athletic field/playground/tennis courts & pavilion into two full-size synthetic turf football/soccer/lacrosse fields with Musco Sports Lighting, bleachers and press box. • Incorporate stormwater infrastructure to meet regulatory requirements • Build a sledding hill, fishing outcroppings and parking lot • Other projects elements as prepared by the design consultant. • The expected construction start time of this project is Spring 2023. • The RE/CE shall prepare and issue bidding documents to retain general contractor for this project. Centennial Park West • Build a concert venue with an event stage that includes green rooms, storage, rigging, loading dock, lawn seating, vendor pads, paths, and fencing. • Other projects elements as prepared by the design consultant. • The RE/CE shall prepare and issue bidding documents to retain general contractor for this project.