Division No. 1 Parking, Ballfield and walkways:
Work for this division consists of; clearing, soil erosion measures, earthwork, site grading, 6” 21AA gravel
parking lot, walkways consisting of 2” crushed limestone fines over 4” crushed limestone, boulder retaining
walls, rain gardens, 2’ dia inlet and 4” PVC storm pipe, parking lot striping, baseball fields with base systems
and infield/outfield material, chain link backstops, dugouts with aluminum benches, chain link fencing (varied
heights), plastic recycled site benches, parking and identification signage, plastic recycled trash and recycle
bins.
Division No. 2 Parking, Basketball Volleyball Court and walkways:
Work for this division consists of; clearing and grubbing, soil erosion measures, earthwork, site grading, 6”
21AA gravel parking lot, walkways consisting of 2” crushed limestone fines over 4” crushed limestone, ADA
signage, parking lot striping, 1-4” reinforced concrete basketball court with backboard system and court
striping, 4-sand volleyball courts (15” deep) with nets/systems, plastic recycled benches, picnic tables, trash
and recycle bins, and solar light poles.