The Scope of Work covered by the Contract Documents includes the construction of a Town Square park in Cherry Hill Village surrounding the historic Cherry Hill School. The project
involves infrastructure changes to the property, including the removal of existing parking lots, West St and School House Rd, the removal of water main and storm sewer and associated
structures, and hydrant relocation; construction of new site amenities and associated underground utilities, including construction of a new hill using stockpiled spoils, pathways,
plazas, park entry signage, site lighting, a 40-ft pre-fabricated bridge, bike racks, benches and other seating areas, trash/recycle stations, and dog waste stations; replacement of curb,
pavement, and ADA ramps within Wayne County ROW; construction of a new exterior restroom building, including construction of associated utilities; relocation of an existing dumpster pad and screening; installation of an irrigation system and relocation of existing irrigation controls to the proposed restroom building; installation of two proposed fountains and associated electrical components; installation of a pond re-fill mechanism; and site landscaping.Alternates to the project include construction of proposed stage, extending the existing sanitary
sewer to the northeast property line, and pathways on the proposed hill.