Summary of Specifications:
This work shall consist of horizontally cutting concrete sidewalk joints, as directed by the Engineer, for the purpose of removing vertical deflections. This work shall also include any required vehicular or pedestrian traffic control; and administrative costs to perform the work as described herein. All work shall be done in accordance with the City Standard Specifications, except as specified herein, and as directed by the Engineer. Sidewalk joint cutting will be organized and scheduled by the City and the Contractor such that cutting can be done at multiple locations within a relatively large designated area. This item is not intended to be used at single locations outside of these designated areas, unless acceptable to the Contractor. Once areas have been marked by the Engineer for cutting, the Contractor will have a maximum of 60 days to complete all joint cutting within the area marked. The Contractor shall schedule and coordinate work with the Project Engineer, so as to allow for the inspection of all work. A Progress Schedule shall be prepared and submitted to the Project Engineer prior to the commencement of the contract work within the specified work area.