Summary of Specifications:
Work to be done includes the 2-phase stabilization of streambanks at various locations along the Millers Creek east of Huron Parkway between Glazier Way and Hubbard Road located within the City of Ann Arbor, and all related work.
Bid documents may be obtained on or after Monday, May 5, 2008 from the office of the Procurement Unit, Fifth Floor, City Hall, Ann Arbor, Michigan. A fee of $15.00 per set of documents will be charged. No refunds will be given for returned documents.
A mandatory pre-bid meeting will be held on Monday, May 19, 2008 at 10:00 a.m. The meeting will be held in at the office of Environmental Consulting and Technology, Inc. (ECT) 2200 Commonwealth Boulevard, Suite 300, Ann Arbor, Michigan.
Each proposal shall be accompanied by a certified check, or Bid Bond by a recognized surety, in the amount of 5% of the total of the bid price. A proposal, once submitted, becomes the property of the City. In the sole discretion of the City, the City reserves the right to allow a bidder to reclaim submitted documents provided the documents are requested and retrieved no later than 48 hours prior to the scheduled bid opening.
The successful Bidder will be required to furnish satisfactory performance and labor and material bonds in the amount of 100% of the bid price and satisfactory insurance coverage.