Summary of Specifications:
The approximate quantities of work involved in the project are as follows: Mobilization, Max 5% 1 LSUM Sewer Remove, less than 24”, Modified SP 40 LFT Pavement Removal, Modified SP 1,750 SYD Drainage Structure Removal, Modified SP 2 EA Machine Grading, Modified SP 1.97 STA Subgrade Undercutting, Modified SP 100 CYD Erosion Control Inlet Filter Fabric Drop Modified SP 4 EA Aggregate Base Under Conc. (6” 21AA Crush Limestone) 1,520 SYD Sewer Class IV, 12” Trench Det. “B”ASTM 76, Mod. SP 55 LFT Drainage Structure, 24” Inlet Modified SP 2 EA Drainage Structure 48” Dia., Modified SP 1 EA Drainage Structure Cover 1,140 LBS Adjusting Drainage Structure Cover Case 1, Modified SP 3 EA Sewer Bulkhead 12” and Under, Modified SP 1 EA Underdrain Subgrade, Open Graded 6”, Modified SP 60 LFT Sewer Trap 12”, Modified SP 1 EA Hot Mix Asphalt, 13A 2”, leveling, Modified SP 140 TON Hot Mix Asphalt, 13A 2” Topping, Modified SP 140 TON Hand Patching 20 TON Conc. Pavement w/integral Curb & Gutter Non-Reinf. 7” 70 SYD 24” Curb and Gutter Section, Non-Reinf. 7”, Modified SP 840 LFT Sidewalk Conc. Non-Reinf. 6” Conc Sidewalk Modified SP 1,150 SFT Class “A” Sodding, Modified SP 600 SYD Minor Traffic Devices, Modified SP,5% max 1 LSUM Salvage Sign, Modified SP 5 EA Project Clean up, 5% max 1 LSUM Inspection Crew Days, Modified SP $320.00 DAY
Copies for bidding purposes may be obtained through the Michigan Inter-governmental Trade Network (MITN). Contact Jennifer L. Wilson at (248) 691-7450 with any questions.
Each proposal shall be accompanied by a certified check, cashier's check, money order or bid bond by a surety company licensed to do business in the State of Michigan in the amount of at least five (5%) percent of the amount bid, drawn payable to the City of Oak Park, Michigan, as security for the proper execution of the Contract.