Summary of Specifications:
CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT
The City of Romulus is soliciting qualifications from vendors for the Consulting Engineering and Testing services for the reconstruction of Goddard Road from Romaine Street to Wayne Road.
The construction engineering for this project will include all surveying, staking, field inspection, construction administration and quality control testing in accordance with MDOT requirements, specifications and guidelines. Consultants considered for these services must hold an approved status on MDOT’s pre-qualification list for Road Construction Engineering. All firms must also have working experience with Field Manager software and the MERL Program.
This project consists of work on Goddard Road between Romaine Street to Wayne Road, and the Wayne Road and Goddard Road intersection in the City of Romulus, Section 20, Wayne County, Michigan.
The P.O.B. is located at the Goddard Road and Romaine intersection. The P.O.E. is located approximately 500-feet east of the Goddard Road and Wayne Road intersection, including 1,000-feet of Wayne Road centered at the Goddard intersection.
Goddard Road from Romaine Street to Wayne Road is a 3-lane concrete roadway, with north and south bound travel lanes and a center left-hand turn lane. The road is 39.16-feet as measured from back of curb to back of curb, and is comprised of at least 9-inches of concrete over a 4-inch aggregate base. Wayne Road is a 4 lane composite pavement cross section with two lanes in each direction.
This project will include the removal of the concrete pavement section and the integral curb and gutter. The concrete pavement will be replaced with an 8-inch asphalt pavement section. The integral curb will be replaced by Type F4 concrete curb and gutter. In areas where integral curb removal affects ramps and sidewalks, ADA compliant ramps and sidewalks will be installed. New pavement markings will be placed and restoration of the affected areas will include mulch blankets, seeding mixtures, and topsoil.
The Wayne Road cross section will consist of a concrete pavement cross section with integral curb and gutter. The road width will be expanded to include a dedicated left hand turn lane.
The project is scheduled to be constructed during the 2014 construction season. Construction should commence in May 2014 and be completed by November 2014, unless otherwise noted in the contract.