Colasanti Construction Service, Inc./O’Brien Construction Company, Inc. a Joint Venture is the
Construction Manager for the construction of the new City of Royal Oak Connectivity Project. The
Construction Manager will receive proposals up to 12:00pm., local time, October 9, 2018 for the following trades from qualified bidders:
1) Concrete (Flatwork/Foundations/Site Concrete)
2) Masonry
3) Structural Steel/Misc. Metals/Decorative Metals
4) Millwork/Solid-Surface Countertops
5) Waterproofing/Dampproofing/Joint Sealants
6) Metal Wall Panels/Aluminum Wall Panels
7) Roofing
8) D/F/H
9) Glazing
10) OH Doors
11) Carpentry/Drywall/Wood Ceilings/Acoustical Ceilings
12) Hard Tile
13) Floor Finishes (Carpet/Resilient/Wood)
14) Hard Tile
15) Floor Finishes (Carpet/Resilient)
16) Painting/Coatings
17) Toilet Accessories/Compartments
18) Signage
19) Fire Extinguishers/Fire Cabinets
20) Elevators
21) Fire Suppression
22) Plumbing
23) HVAC
24) Electrical/Low-Voltage/Fire Alarm
25) Fence/Gates
Project Description
This project consists of the construction of a new 31,000SF City Hall Building. This new building consists of a Basement, 1st Floor, and 2nd Floor. Exterior Construction is masonry, cast stone/limestone, metal panel assemblies, and glass windows/storefronts. Interior Construction is standard metal stud construction, millwork, finishes, ACT/Gypsum ceilings, water pipe fire suppression systems, dry chemical suppression system, plumbing systems to support bathrooms, forced air HVAC assemblies, hot water reheat system w/ boilers, standard electrical distribution and lighting systems, fire alarm, and access control systems.