The work shall consist of, but not be limited to: (1) removing existing concrete street pavement in sections or partial and full width sections of various lengths and locations; (2) repairing miscellaneous areas of concrete pavement deterioration and restoration of utility repair areas; (3) preparing the subbase and replacing the concrete pavement; (4) adjusting and/or reconstructing drainage and other public utility structures; (5) sidewalk removal and replacement, including ADA crosswalks; (6) traffic control, restoration and clean-up; and, (7) storm structure and pipe cleaning.
These Specifications also cover the repair of existing deteriorated concrete pavements, and the restoration of utility repair areas, including; the removal of temporary patching materials, replacement of existing concrete pavement, the repair and conditioning of the aggregate base, adjusting utility structures, concrete sidewalk, ADA ramp, and the restoration of concrete driveways and approaches. This work shall be performed and paid for in accordance with the Special Provisions provided in these Specifications.
The locations of the repair and restoration work will assembled by the City of Taylor and presented to the Contractor for work in a minimum of three (3) packages. The work packages will be assigned in April, July and October and are to be completed by the end of that month unless authorized by the City. There may be repair or restoration locations considered “urgent” which may be assigned to the Contractor for immediate attention at any time during this Contract while the Contractor is performing work on this Contract.