Summary of Specifications:
Proposals are being solicited only from responsible and established firms known to be experienced and regularly engaged in the work of demolition, particularly demolition of non-residential buildings and removal of demolition debris to appropriate disposal sites. The successful proposer(s) shall be responsible for performing the work in compliance with all relevant federal, state and local laws. The GCPRC has developed the following specifications relative to the work to be performed by the successful proposer: 1. SPECIFICATIONS This proposal shall include the cost of demolition of a 100’ x 300’ building commonly referred to as the “Sawtooth Building” located at the Everett A. Cummings Center, 6130 E. Mt. Morris Road, Mt. Morris, MI 48458. The GCPRC will be responsible for removing all Electrical and Water service to this building. The contractor’s proposal shall include removal of all material including concrete slabs and footings. A. Asbestos Removal: The building proposed for demolition was built prior to 1980. The asbestos testing report for this building is included in the Request for Proposal. Therefore, proposers are notified that their workers shall be properly trained for asbestos removal, and the cost for removal of asbestos must be included in your proposal as a separate cost item. The successful proposer is responsible for the proper removal of asbestos containing materials and compliance with applicable laws related thereto. See the additional documentation titled “sawtooth asbestos report” at the Purchasing current bids page of www.gc4me.com.