Summary of Specifications:
The project consists of the following: TOWER 1. Renovation of Administrative Offices as shown including but not limited to: a. New Walls. b. New ceiling c. New floor finishes and painting d. New millwork and casework e. New doors – sound rated and standard solid core wood doors. f. New sound rated interview and polygraph rooms g. New HVAC and plumbing fixtures in Administrative areas. h. New room signage i. New LED lighting. Contractor is responsible for preparing and submitting all paperwork required by utility company for rebates. Owner to receive full amount of rebate from utility company. j. New power and technology raceways 2. Replacement of stainless steel showers and associated material as indicated in the prisoner housing areas floors 2 – 12. 3. Removal of existing RT equipment and infill with metal deck and BUR. D BLOCK 1. Creation of new fire separation walls with replacement of existing non rated doors and frames. a. Extension of the existing fire suppression system to the new fire separation walls. b. Patching/firestopping of any existing walls forming the new fire separation for (2) hour continuity. 2. Rebuilding of D Block dorm shower and toilet facilities with SGFT. 3. Repainting of existing walls, doors and frames, bars ceiling, and detention furniture and ductwork, conduits, etc. 4. New LED lighting. Contractor is responsible for preparing and submitting all paperwork required by utility company for rebates. Owner to receive full amount of rebate from utility company. 5. New plumbing fixtures and piping. MAXIMUM SECURITY 1. Creation of new fire separation walls with replacement of non-rated doors and frames. a. Extension of the existing fire suppression system to the new fire separation walls. b. Patching/firestopping of any existing walls forming the new fire separation for (2) hour continuity. PHASING: Work in the Tower Administrative areas shall start immediately upon award of work anticipated beginning of October 2016 with completion of work by January 15, 2017. Work in D Block and Tower areas shall be completed by December 30, 2017.