Summary of Specifications:
Project consists of:
1. Disconnection, removal and legal offsite disposal of the existing flight type dish machine. a. Existing scrap table shall be salvaged for reinstallation. 2. Procurement and installation of a new flight type dish machine. 3. Replacement of portions of the existing gypsum board ceiling. A portion of the ceiling removal will be by others as indicated on drawings. 4. Temporary support of existing light fixtures, smoke detectors, speakers, strobes, exit signs, etc. at ceiling areas not removed by others. 5. Removal and installation of new GRD’s in removed gypsum ceiling areas. 6. Removal of existing and installation of new ceiling access hatches in removed gypsum ceiling areas. 7. Prep to bare metal and repainting of existing designated HM door and frame. 8. Repainting of new gypsum board ceiling. 9. Patching of any damaged quarry tile and/or porcelain ceramic wall tile. 10. Start up and testing of new dish machine. 11. Maintenance and service program/agreement for a period of five years.
Note: The Bidder shall include a contingency of $5,000.00 in the base bid as a Construction Contingency. This amount, when unused, will be returned to the Owner. This allowance will only be used after written authorization of the Owner’s representative.