The 2024 Pathway Gap Closure Program project consists of constructing new 8-foot-wide pathway to fill in gaps at eight locations in Macomb Township: 25 Mile Road (northwest corner of the intersection of 25 Mile Road and Romeo Plank Road); 25 Mile Road (southwest corner of the intersection of 25 Mile Road and Garfield Road); 25 Mile Road (southeast corner of the intersection of 25 Mile Road and Garfield); Garfield Road (east side of Garfield Road just south of 25 Mile Road); Hayes Road (east side of Hayes Road south of 24 Mile Road); 17778 22 Mile Road (west of Romeo Plank Road); Plattsburg Street (southwest corner of the intersection of Plattsburg Street and Broughton Road); and 46816 Fairchild Road (south of 21 Mile Road). The work includes approximately 20,000 square feet of 4-inch concrete pathway, 5,000 square feet of 6-inch concrete pathway, 380 square yards of 6-inch concrete driveway, and other miscellaneous items, in accordance with the Bidding Documents prepared by the ENGINEER.
The project was designed by Fishbeck (ENGINEER), who is to act as OWNER's representative.