Heintzen Maintenance Building All out-structures, related pavement and utilities
The scope of work encompasses the complete removal of all existing furniture, equipment, mechanical and electrical equipment, etc. and legal disposal of all hazardous materials noted in the potential hazardous material report. The Contractor’s scope of work includes but is not limited to demolition of superstructure, removal of adjoining sidewalks, foundations and all buried utility lines (storm, sanitary, water, etc.). Once the demolition work has been completed, the Contractor is responsible for the placement of engineer fill, topsoil, seed and mulch blanket finished to the same elevation as adjoining areas. There are no known contaminated soils on the property. However, the Contractor is to immediately stop work and notify SCS upon discovery of any suspected contaminated conditions. All available drawings of the building have been included in this RFP. Contractor is to verify all existing conditions now shown on the provided drawings. SCS will remove salvageable items from the facility prior to commencement of demolition, all remaining items to be legally disposed of by the Contractor. SCS anticipates demolition to begin as early as June 19, 2023 and 100% complete no later than September 4, 2023. Once construction starts, the project is to remain active until the work is complete. Allowing the site to become idle during the demolition process will not be allowed.