The purpose of this RFP is for the procurement of new office furniture for SMART offices at Macomb, Oakland, Wayne & the Buhl Building.
The work to be done is shown on the accompanying set of original drawings prepared by the Engineer, and are hereby made a part of this Contract, it being mutually understood and agreed that when taken together, the drawings and contract documents, including the specifications and the general conditions, are complementary, and what is called for by any one shall be binding as if called for by all. The intent of the Contract documents is to include in the contract price the cost of all labor and materials, water, fuel, tools, plant, equipment, light, transportation, and all other expenses as may be necessary for the proper execution and completion of the work.
These original drawings may be supplemented by other drawings furnished by the contractor and approved by the Engineer or supplied to the Contractor by the Engineer during the progress of the work as he may deem to be necessary or expedient. All such supplementary contract drawings or instructions are intended to be consistent with the Contract Documents, true developments thereof and reasonably inferable therefrom. Therefore, no extra charge will be allowed on a claim that particular supplemental contract drawings or instructions differed from the Contract Documents, incurring extra work, unless the Contractor has first brought the matter, in writing, to the Engineer's attention for proper adjustment before starting on the work covered by such and has received from the Engineer an order in writing to so proceed.
These original and supplementary drawings constitute the drawings according to which the work is to be done. The Contractor shall keep at the site of the work an approved or conformed copy of all drawings and specifications and shall at all times give the Engineer or SMART access thereto.
In case any inconsistency, omission or conflict shall be discovered in either specifications or drawings, or if in any place, the meaning of either or both shall be obscure, or uncertain, or in dispute, the Engineer shall decide as to the true intent and his decision shall be final and binding.