The Village of Lexington is accepting bids for concrete work in the Village of Lexington at the North Shore Mobile Home Park, along with other site work needed throughout the village, which could include sidewalks, driveways, and slabs. This contract shall be for the entire 2023 - 2024 construction season. This contract would enable the village to proceed with projects faster and save time. We understand that the 2024 concrete costs could increase, so we will allow for a rate increase equal to the cost per yard increase of concrete for that year if needed.
Bids will be based on an all-inclusive square foot price for site preparation, installation of new pads (Per HUD MHCSS 8/10/09 see attached), and restoration of the site after slab installation. Contractors shall also include an all-inclusive cost per square for removal of existing concrete pads as needed. Other forms of work shall include an all-inclusive cost per square foot for the installation of 4” and 6” sidewalks, removal of old sidewalk, 4” and 6” all-purpose slabs, and 6” driveway approaches. See the complete specs for each item below.