Sealed proposals for the construction of the 2024 Local Streets Resurfacing Project will be received by the Village of Romeo at the office of the Village Clerk located at 121 W. St. Clair, Romeo, MI 48065, (586)-752-3565, until 10:00 a.m., Local Time on Wednesday, April 17, 2024, at which time and place all bids will be publicly opened and read.
Bidders shall review and comply with the Instructions to Bidders, which are incorporated by reference, and carefully review all Contract Documents, as defined in the Instructions to Bidders. Bids submitted after the exact time specified for, receipt will not be considered.
The Contracts will consist of the constructing a new sidewalk which includes the following principal items of work and appurtenances as specified herein and shown on the Contract Drawings.
Description of Work
HMA Surface, Rem.................................................................................... 50,929 Syd
Sidewalk, Rem................................................................................................ 583 Syd
Curb and Gutter, Rem...................................................................................... 4,130 Ft
Storm Sewer, Cl IV, 12 inch................................................................................ 261 Ft
Dr Structures......................................................................................................... 7 Ea
Dr Structure Cover, Adj..................................................................................... 121 Ea
Dr Structure Covers............................................................................................. 49 Ea
Curb and Gutter, Conc..................................................................................... 3,990 Ft
Aggregate Base Conditioning...................................................................... 53,687 Syd
HMA, 4EML............................................................................................... 6,506 Ton
HMA, 5EML............................................................................................... 6,506 Ton
Sidewalk, Conc, 4 inch................................................................................... 1,272 Sft
Sidewalk Ramp, Conc, 6 inch......................................................................... 4,055 Sft
Aggregate Base, CIP (as needed)................................................................... 1,566 Ton
Clean and Televise with PACP Reporting, 8”-18” Dia, San Swr (as needed)....... 9,769 Ft
Point Repair, 12 inch (20’ length)........................................................................... 2 Ea
Cut/Grind Mineral Deposit (as needed)................................................................. 65 Ea
Sewer Lining, 8”-18” RIFI-CIPP...................................................................... 9,311 Ft
Plus miscellaneous items of removals, restoration, erosion control, audio-video route survey, maintaining traffic, and other items for a complete project.