Summary of Specifications:
The building is two level slab on grade with CMU exterior bearing walls, steel structural frame and light gage metal framing interior walls. The exterior finishes are stained CMU block and Portland Cement Plaster with an elastomeric finish over CMU. Windows and doors are hollow metal frame with metal inserts and insulation. Roofing is a standing seam metal in some areas and a single ply TPO membrane in other areas. Interior partitions are light gage metal framing with textured, painted gyp board finishes, ceilings are lay-in acoustical tile with solid gyp board in some locations. The entire building is insulated. Specialties include marker boards, tack boards, casework, projection screens, floor finishes are VCT, carpet, ceramic tile, and room signage.
The Gymnasium is fitted with basketball backstops, scoreboards, volleyball equipment, athletic flooring. Site work includes site, demolition of existing, site improvements, clearing, grubbing, paving curb gutter, sidewalks, including a fire access roadway, retaining walls, utility connections, chain link fence removal, and replacement. Site work also includes drainage, grading, cut and fill work, and imported fill. Site utilities: Communications, gas, water, sewer, and fire line.