Summary of Specifications:
The Work consists of three separate and distinct parts: The following is a brief summary of each part, refer to construction documents for complete scope of work. 1. Deficiencies Correction Unit (DCU) work: a. Site work including site demolition, , paving, curb, sidewalks, foundation, utility power abandonment, and site preparation for new site work. New site work includes drainage grading, site utilities, paving, sidewalks, curbs and gutters, and light poles. b. DCU work consisting of demolition of walls for new doors and windows, painting, asbestos abatement and removal, new flooring and ceiling installation work, special systems, and mechanical and electrical upgrades.
2. Add new classroom building: a. Site work for pad build-up and foundations b. Segmental retaining walls c. Add a new propane tank d. New power poles, 3-phase service and transformer e. Add a water tank with new pump and hydrants f. 6th, 7th, and 8th grade classrooms g. Science classroom h. Girl’s and Boy’s Toilet Rooms i. Corridors j. Elevator and stair tower and entry k. Janitor, IDF and Electrical Rooms. l. Connection to existing building and required exit ways 1) Related structural and mechanical and electrical work m. UL rated wall and ceiling assemblies. See drawings.
3. Add new Gymnasium building a. Site work for a level building pad and foundation work. b. Adjacent Storage, Janitor, Mechanical chase, Coach’s Office with toilet and storage. c. Girl’s and Boy’s Locker Rooms, Showers and Toilet Rooms d. Snack Bar