Summary of Specifications:
The Work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: establishing site controls, installing stormwater pollution prevention devices, clearing and grubbing the site, removal and delivery of utility poles and associated electrical equipment on the project site to the owner, removal of an existing stone monument and delivery to the Owner, abandonment of three small pipelines, installation of two bulkheads along the riverfront, installation of rip-rap revetment to provide shoreline protection in non-bulkhead zones, excavation and off-site disposal of contaminated soils, backfilling the excavated areas with on-site materials and imported clean fill, temporary management of impacted groundwater, the removal of an underground storage tank and six-inch pipeline containing groundwater and/or weathered petroleum product, site grading, installation of geotextile demarcation barrier across the site, placing and compacting soils, abandonment of monitoring wells, and performing quality assurance/quality control (QA/QC) testing and other related work. An alternate for the project includes the placement of topsoil on the property and the establishment of vegetation via seeding and mulching the site.