NAME OF PROJECT: Replacement of Bridge W-30 (BIN 3344110) Verbank Road Over Unnamed Creek Town of Washington, Dutchess County, New York
Please note that, at the time of original publication, the RFB and supporting documents are split between four files. The PDF with the main information is 195 pages long, and the PDF of the Drawings/Plans is 41 pages long. An Excel file of the itemized Bid Proposal form is also being provided, along with Historical Records from 1988 and 1931. If an addendum is published, it will be uploaded as a separate file.
Project Description: This project includes the removal of the existing bridge, installation of a steel multi-girder bridge on integral abutments, full depth reconstruction, mill and overlay and box widening of Verbank Road.
The anticipated start of construction is March 17, 2025; the anticipated substantial completion date is September 5, 2025. Failure to meet these dates may result in liquidated damages