This project involves the replacement of Bridge S-39 (BIN 3343870) CR 17 over Willow Brook, and Bridge S-40 (BIN 3343880) CR 17 over Wappinger Creek, Town of Stanford, DUTCHESS County.
Please note that, at the time of original publication, the RFB and supporting documents are split between three files. The PDF with the main information is 190 pages long, and the PDF of the Drawings/Plans is 54 pages long. An Excel file of the itemized Bid Proposal form is also being provided. If an addendum is published, it will be uploaded as a separate file.
Project Description: This project consists of the Replacement of the existing bridge superstructure and abutments for two bridges. The existing piers for one bridge will also be removed and replaced. Minor approach roadway work and replacement of guiderail in the vicinity of the bridge are also included in this project.
The anticipated start of construction is March 18, 2024; the anticipated substantial completion date is November 29, 2024. Failure to meet these dates will result in liquidated damages.
This project may be subject to NYS Department of Labor Prevailing Wage Rates PRC #: 2023014276