Summary of Specifications:
Sealed bids will be received until 2:30 PM on May 21, 2013 at the Rochester City School District building at 1776 North Clinton Ave., Rochester, NY 14621(Maynards Electric Supply) by the Rochester Joint Schools Construction Board (“RJSCB” or “Owner”), Attention: Thomas Renauto, Executive Director Tel. 585-512-3806, for the Edison Educational Center project Phase 1B (“Project”), at which time and place said bids will be publicly opened and read aloud. Questions during the bidding period must be emailed to Thomas Renauto at: Edison@rjscb.org. The Owner will not accept or respond to questions from prospective bidders received orally or by facsimile. Edison Educational Center project Phase 1B (“Project”) includes:
Complete removal and renovations of the third floor science labs (approximately 30,0000sqft) Complete removal and renovations of the second floor library and 8 +/- surrounding class rooms Complete removal and renovation of the serving area within the cafeteria Complete boiler room renovations including new boilers Extensive “waffle slab” restoration, tendon drying, replacement and re-greasing All work associated with the installation of waterproofing of the existing foundation walls above and below grade including site restoration Foundation wall and footing repairs Site work Building wide electrical head end upgrades