The following is a general description only and shall not be construed as a complete description of the Work to be performed for this Project. The principal features of the Work to be performed include:
Eight (8) existing roadways within the Long Pond Road Improvement District will be reconstructed. These include: Hillside Road, Cross Road North, Highland Road, Pleasant Road, Rosemarie Lane, Birch Hill Road, Hillside Drive and Clearview Road.
Proposed roadway reconstruction activities will include minor modifications to the horizontal and vertical alignments of various sections of roadway and roadway widening at certain locations to improve site distances. All roads will be re-surfaced with asphaltic cement concrete (i.e., asphalt). At present, several of the identified roads including: Hillside Road, Cross Road North, Hillside Drive and Clearview Road are surfaced with asphalt. The balance of roads including: Pleasant Road, Rosemarie Lane, and Birch Hill Road are gravel (NYSDOT Item-4) surfaced. Highland Road is asphalt surfaced to the north of Cross Road North and gravel surfaced to the south.
Stormwater runoff from roadways and adjacent tributary areas is conveyed in existing roadside ditches and drainage swales that direct runoff to wetland areas and surface waterbodies to the south and east. The existing roadside ditches and swale drainage system will be retained and regraded.
Roadway re-alignment and widening activities will be completed along various sections of the following: Hillside Road, Cross Road North, Highland Road-II, Pleasant Road, Rosemarie Lane and Birch Hill Road. Nominal widening activities will be completed on Hillside Drive, with asphalt pavement re-surfacing only scheduled for Clearview Road and Highland Road. The total length of road scheduled for reconstruction is ±7,510 linear feet. Existing roadways widths vary from ±10 to ±18 feet. Widening activities will be completed on Hillside Road, Cross Road North and Highland Road-II to provide a minimum traveled-way width of 16 feet. Pleasant Road, Rosemarie Lane, Birch Hill Road and Hillside Drive will be widened to provide a minimum traveled-way width of 14 feet. Clearview Road and Highland Road-I will remain at their current respective traveled-way widths.
Contract Documents may be examined at the OFFICE OF THE TOWN CLERK between the hours of 8:30 AM and 4:30 PM and the TOWN CONSULTING ENGINEER, J. Robert Folchetti & Associates, L.L.C., 31 Sodom Road, Brewster, NY 10509 between the hours of 8:30 AM and 4:30 PM beginning March 2, 2017.