Sealed bids will be received by Village of Croton-on-Hudson at: Stanley H. Kellerhouse Municipal Building, 1 Van Wyck Street, Croton-on-Hudson, NY 10520 until 11:00 a.m. Thursday December 12, 2019, at which time they will be publicly opened and read on the 2nd floor of the Stanley H. Kellerhouse Municipal Building. Bids shall be addressed to Janine King, Village Manager, Village of Croton-on-Hudson, 1 Van Wyck Street, Croton-on-Hudson, NY 10520.
The work site is located on Croton Point Avenue (from Veterans Plaza to South Riverside Avenue) and at the intersection of South Riverside Avenue and Benedict Boulevard. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Roadway paving, full depth pavement repairs, box widening, sidewalk reconstruction, drainage system improvements, traffic signal installation, signing and pavement striping. This is a Federal Aid Project and NYSDOT Standard Specifications, officially finalized and adopted on September 1, 2019 as posted on the New York State Department of Transportation’s website must be followed by the successful bidder. All construction operations for this project are scheduled to begin no earlier than April 1, 2020. If the contractor feels it is necessary to commence construction operations prior to April 1, 2020, the contractor must receive written approval from the Village of Croton-on-Hudson. All work is to be substantially completed by November 1, 2020; final completion shall be by December 31, 2020.