Summary of Specifications:
SCOPE: Base Bid:
The base bid work for the project consists of asbestos abatement for the demolition and removal of a 44' long x 16' wide steel bridge located at the crossing of Chatiemac Road over Baker Brook in the Town of Johnsburg, NY (the location is noted on the map attached to these specifications). This bridge is known to have paint containing asbestos. It will be the responsibility of the successful bidder to abate the existing asbestos containing paint for torch cutting operations associated with the demolition and removal of the bridge. Abatement of the asbestos containing materials must be complete NO LATER THAN AUGUST 16, 2010.
Add Alternate No. 1:
The Add Alternate No. 1 work for the project consists of demolition, removal and disposal of the existing steel superstructure items. This shall include, but shall not be limited to the stringers, diaphragms, rail posts and attachments, decking, backwalls, bearings, and anchorage down to the top of the existing concrete bridge seat. Removal of the entire superstructure must be complete NO LATER THAN SEPTEMBER 1, 2010.
AWARD: Award will be made to one vendor for one or all portions of the project.
Attached are bid specifications for WC 66-10 Asbestos Abatement, Demolition and Removal of a 44' x 16' Steel Bridge with Asbestos Paint, Johnsburg, NY.
Bids are due on Thursday, July 15, 2010 at 3:00pm.
Questions, if any, need to be in written form and are due by Wednesday, July 7 at 3:00pm. Please fax all questions to Julie Pacyna, Purchasing Agent to 518-761-6395. I will be on vacation starting this Friday (7/2/10) through next week.
George VanDusen is the DPW Engineer working on this project. 518-761-6556.
Thank you,
Jason Shpur Deputy Purchasing Agent